{"id":2139,"date":"2017-07-01T19:37:18","date_gmt":"2017-07-01T19:37:18","guid":{"rendered":"http:\/\/162.250.126.19\/~impagove\/?page_id=2139"},"modified":"2018-01-16T09:43:07","modified_gmt":"2018-01-16T09:43:07","slug":"supervision-of-project-implementation","status":"publish","type":"page","link":"https:\/\/impa.gov.eg\/en\/supervision-of-project-implementation\/","title":{"rendered":"Supervision of Project Implementation"},"content":{"rendered":"<p>[vc_row][vc_column]<ul class=\"tt-toggle\">\r\n\t\t\t<li class=\"sub-toggle\">\r\n\t\t\t\t<div class=\"toggle-head\">\r\n\t\t\t\t\t<div class=\"toggle-head-sign\">&minus;<\/div>\r\n\t\t\t\t\t<p>Classification of Service<\/p>\r\n\t\t\t\t<\/div>\r\n\t\t\t\t<div class=\"toggle-content\">\r\n\t\t\t\t<\/p>\n<ul style=\"list-style-type: disc;\">\n<li>Supervision is provided to projects either designed by IMPA or by client. Service is given to the whole or part of the project based on the type of work. Either a round-the-clock or periodic supervision can be provided, e.g. quality control service, based upon the wish of the client.<\/li>\n<\/ul>\n<p>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/li><\/ul><ul class=\"tt-toggle\">\r\n\t\t\t<li class=\"sub-toggle\">\r\n\t\t\t\t<div class=\"toggle-head\">\r\n\t\t\t\t\t<div class=\"toggle-head-sign\">&minus;<\/div>\r\n\t\t\t\t\t<p>Items of Service<\/p>\r\n\t\t\t\t<\/div>\r\n\t\t\t\t<div class=\"toggle-content\">\r\n\t\t\t\t<\/p>\n<ul style=\"list-style-type: disc;\">\n<li>Setting time schedules and executive plans and financial flow program for the project\u2019s implementation stages.<\/li>\n<li>Handing over the site and technical acceptance of contractor.<\/li>\n<li>Interpretation of documents\u2019 variances and providing the contractor with complementary drawings and instructions if any.<\/li>\n<li>Supervision of site work per definite plans and contract specifications.<\/li>\n<li>Coordination between contractor and owner about any recent developments in timing and progress of work.<\/li>\n<li>Procurement and follow-up of supplies and storage of equipment and items as per contract.<\/li>\n<li>Quality control and removal of defective materials and works.<\/li>\n<li>Supervision of manufacture and checking supplies at factories locally and abroad.<\/li>\n<li>Attending measurements, checking items of work, stock inventory and revision of progress payments.<\/li>\n<li>Attending boring job, provisional tests and preliminary operation.<\/li>\n<li>Assessment of contingencies, modifications, additional work. etc.<\/li>\n<li>Suggestion of suitable problem solutions if any, in coordination with concerned party.<\/li>\n<li>Commissioning, labor training and approval of final drawings and documents.<\/li>\n<li>Taking over and treatment of any troubles that may occur.<\/li>\n<li>Measuring average of achievement and preparing reports of work progress.<\/li>\n<li>Cost and quality monitoring.<\/li>\n<li><\/li>\n<\/ul>\n<p>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/li><\/ul><ul class=\"tt-toggle\">\r\n\t\t\t<li class=\"sub-toggle\">\r\n\t\t\t\t<div class=\"toggle-head\">\r\n\t\t\t\t\t<div class=\"toggle-head-sign\">&minus;<\/div>\r\n\t\t\t\t\t<p>Method of accounting<\/p>\r\n\t\t\t\t<\/div>\r\n\t\t\t\t<div class=\"toggle-content\">\r\n\t\t\t\t<\/p>\n<ul style=\"list-style-type: disc;\">\n<li>As agreed and contracted and according to volume and progress of work<\/li>\n<\/ul>\n<p>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/li><\/ul>[\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"gap clearfix\" style=\"height: 35px;\"><\/div>[\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][\/vc_column][\/vc_row][vc_row][vc_column][\/vc_column][\/vc_row]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/pages\/2139"}],"collection":[{"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/comments?post=2139"}],"version-history":[{"count":5,"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/pages\/2139\/revisions"}],"predecessor-version":[{"id":4398,"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/pages\/2139\/revisions\/4398"}],"wp:attachment":[{"href":"https:\/\/impa.gov.eg\/en\/wp-json\/wp\/v2\/media?parent=2139"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}