Iron and Steel Complex and Complementary Projects

[vc_row][vc_column][vc_column_text]Helwan Iron and steel complex was inaugurated in 1973. It is 30 km’s from Cairo. Final stages of the project  was completed in 1979, at a total cost of E.P 516 million.[/vc_column_text][vc_row_inner][vc_column_inner][toggle title=”Components”]

  • 2 blast furnaces
  • Sintering unit
  • Steel unit
  • Iron rolling
  • Foundry
  • Lime and dolomite furnaces
  • Dolomite refractory unit
  • Iron scrap unit
  • Labs, workshops and stores
  • Gas services unit
  • Oxygen unit
  • Steam and compressed air unit
  • Industrial water cooling towers
  • Power station Extension of the complex: The aim is to increase the iron and steel production from 300000 ton/year to 1.5 m. tons/year

[/toggle][toggle title=”Coke Co. fourth battery”]The project was carried out in 1991 at a cost of EG.P 85 million to produce 560000 ton/year of coke.[/toggle][toggle title=”Helwan refractory complexes”]IMPA supervised the execution of the first stage of the project, at an area of 215000 m2. and a cost of EP 27 million. The project includes a river port at an area of 33000 m2. Productivity is 45000 ton/year.[/toggle][toggle title=”Complementary projects executed by IMPA”]

  • El tebbin High Metallurgical Studies Institute.
  • Railway roads and yards at the factory premises
  • Extension of El tebbin river port
  • Electricity network
  • High voltage electric line, samalout- Alwahat Al baharia.
  • El tebbin river port conveyor belt.
  • El tebbin tramway
  • El tebbin water plant.