Projects affiliated to the Ministry of Trade and Industry

  • Work carried out for Productive Sufficiency and Vocational Training Authority

    Forty three vocational training centers were constructed: Work includes the following:

    Preparing the study and design of the preliminary projects and executive drawings for Embaba automotive training center, Benisweif Govornorate, Souhag governorate,, El menia governorate, Port Said Gov. , Kom Ombo, Qena, El Saff, Manyal Sheha, Shobra El Khema, Suez, Ameriya, etc. .

  • Work carried out for Egyptian Standardization and Quality of Production Authority

    Preparing the study and design of the preliminary projects and executive drawings for National Quality Institute, maintenance workshops and storehouses, car and air conditioning protection sheds, mosque extension, building annex, buildings no. 1, 2, 3, 4.
  • Work carried out for the Chemistry Authority

    Preparing the study and design of the preliminary projects and executive drawings for Cairo, Alexandria, Suez, Asuit and 6th October City.
  • Work carried out for Industrial Control Authority

    Preparing the study and design of the preliminary projects and executive drawings for the headquarters in El menia and Mansura Governorates, a part of Dokki headquarters, car shed and vehicles services building, storehouse.
  • Work carried out for Egyptian Mineral Wealth Authority

    Preparing the study and design of the preliminary projects and executive drawings for fence construction, Souhag, Marsa Alam.
  • Work carried out for Ministry of Trade and Industry

    Preparing the study and design of the preliminary projects and executive drawings for the Ministry’s headquarters, Lazogly, Cairo.
  • Work carried out for Technological centers

    Preparing the study and design of the preliminary projects and executive drawings for tec. Center in Kom Oshim, Fayoum, 10th Ramadan city, 6th October City, Victoria (Alex), Jewelry Center, Cairo.
  • Work carried out for Tebin Metallurgy Studies Institute

    Preparing the study and executive drawings for the construction of the High Engineering and Specialized Technology Institute and for small scale industries units.

No Sidebar

This template supports the unlimited sidebar's widgets.
For adding widgets to Footer sidebar Click Here